From mboxrd@z Thu Jan 1 00:00:00 1970 From: Meir Goldenberg Subject: How to make weeks start from Sunday and be numbered from a custom date Date: Sun, 23 Aug 2015 18:10:46 +0300 Message-ID: Mime-Version: 1.0 Content-Type: multipart/alternative; boundary=001a113d54d2c5cd88051dfbe707 Return-path: Received: from eggs.gnu.org ([2001:4830:134:3::10]:60709) by lists.gnu.org with esmtp (Exim 4.71) (envelope-from ) id 1ZTWv2-0007bJ-6i for emacs-orgmode@gnu.org; Sun, 23 Aug 2015 11:10:48 -0400 Received: from Debian-exim by eggs.gnu.org with spam-scanned (Exim 4.71) (envelope-from ) id 1ZTWv0-000840-Py for emacs-orgmode@gnu.org; Sun, 23 Aug 2015 11:10:47 -0400 Received: from mail-oi0-x236.google.com ([2607:f8b0:4003:c06::236]:36308) by eggs.gnu.org with esmtp (Exim 4.71) (envelope-from ) id 1ZTWv0-00083m-Jk for emacs-orgmode@gnu.org; Sun, 23 Aug 2015 11:10:46 -0400 Received: by oiev193 with SMTP id v193so66703866oie.3 for ; Sun, 23 Aug 2015 08:10:46 -0700 (PDT) List-Id: "General discussions about Org-mode." List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , Errors-To: emacs-orgmode-bounces+geo-emacs-orgmode=m.gmane.org@gnu.org Sender: emacs-orgmode-bounces+geo-emacs-orgmode=m.gmane.org@gnu.org To: emacs-orgmode@gnu.org --001a113d54d2c5cd88051dfbe707 Content-Type: text/plain; charset=UTF-8 Two questions: 1. My work week starts on Sunday, so I have: (setq org-agenda-start-on-weekday 0) Now the agenda timeline starts on Sunday as desired. However, it says on top "Week agenda (W34-W35)", i.e. it still thinks that the week starts on Monday. Can I change that? 2. It would be very useful for me if the weeks were numbered from the week when my big work project started. Can I have the week numbering customized to have W01 on a certain date? --001a113d54d2c5cd88051dfbe707 Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable
Two questions:

1. My work week starts on Sund= ay, so I have:

(setq org-agenda-start-on-weekday 0= )

Now the agenda timeline starts on Sunday as = desired. However, it says on top "Week agenda (W34-W35)", i.e. it= still thinks that the week starts on Monday. Can I change that?=C2=A0

2. It would be very useful for me if the weeks were nu= mbered from the week when my big work project started. Can I have the week = numbering customized to have W01 on a certain date?
--001a113d54d2c5cd88051dfbe707--