From mboxrd@z Thu Jan 1 00:00:00 1970 From: Michael Gummelt Subject: Remaining time in effort estimates Date: Wed, 16 Dec 2015 17:48:47 -0800 Message-ID: Mime-Version: 1.0 Content-Type: multipart/alternative; boundary=001a11c266e84b410b05270e39bf Return-path: Received: from eggs.gnu.org ([2001:4830:134:3::10]:46083) by lists.gnu.org with esmtp (Exim 4.71) (envelope-from ) id 1a9NgY-0005h2-OQ for emacs-orgmode@gnu.org; Wed, 16 Dec 2015 20:48:51 -0500 Received: from Debian-exim by eggs.gnu.org with spam-scanned (Exim 4.71) (envelope-from ) id 1a9NgX-0006G7-Ni for emacs-orgmode@gnu.org; Wed, 16 Dec 2015 20:48:50 -0500 Received: from mail-lb0-x22b.google.com ([2a00:1450:4010:c04::22b]:36060) by eggs.gnu.org with esmtp (Exim 4.71) (envelope-from ) id 1a9NgX-0006Fy-Fs for emacs-orgmode@gnu.org; Wed, 16 Dec 2015 20:48:49 -0500 Received: by mail-lb0-x22b.google.com with SMTP id yq9so17641927lbb.3 for ; Wed, 16 Dec 2015 17:48:48 -0800 (PST) List-Id: "General discussions about Org-mode." List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , Errors-To: emacs-orgmode-bounces+geo-emacs-orgmode=m.gmane.org@gnu.org Sender: emacs-orgmode-bounces+geo-emacs-orgmode=m.gmane.org@gnu.org To: emacs-orgmode@gnu.org --001a11c266e84b410b05270e39bf Content-Type: text/plain; charset=UTF-8 Hi, I set effort estimates on a list of subtasks. I can sum those estimates as described here: http://orgmode.org/manual/Effort-estimates.html What I'd like to do is see the remaining effort estimate time in the supertask. For example, if I have a supertask with 10 subtasks, and I mark 3 of them complete, I'd like to see the sum of the 7 incomplete tasks. The link above shows how you can view a CLOCKSUM, but that is a different value. Knowing how long is remaining on a supertask seems to be a fundamental feature for project management. Is there any solution in org mode? Thanks, Michael Gummelt --001a11c266e84b410b05270e39bf Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable
Hi,

I set effort estimates on a list of= subtasks.=C2=A0 I can sum those estimates as described here: http://orgmode.org/manual/Ef= fort-estimates.html

What I'd like to do is= see the remaining effort estimate time in the supertask.=C2=A0 For example= , if I have a supertask with 10 subtasks, and I mark 3 of them complete, I&= #39;d like to see the sum of the 7 incomplete tasks.=C2=A0 The link above s= hows how you can view a CLOCKSUM, but that is a different value.
=
Knowing how long is remaining on a supertask seems to be a f= undamental feature for project management.=C2=A0 Is there any solution in o= rg mode?

Thanks,
Michael Gummelt